日韩一道高清无码,日韩午夜中文字幕青青草网,91精品国产91久久久久久青草,东京热一区二区沙河无码网站

 

Company News

Ningbo Xuyue New Material Technology Co., LTD. Wanyang Zhongchuang City phase II

發(fā)布時間:2024-03-26 13:27:23  點(diǎn)擊量:454

According to the relevant provisions of the construction project completion environmental acceptance procedure, Ningbo Xuyue New Materials Technology Co., LTD. Wanyang Zhongchuang City Phase II "Green Island" project (phase 1) completion environmental protection acceptance is publicized as follows:

Project Name: "Green Island" Project of the second phase of Wanyang Zhongchuang City (Phase 1)

Construction unit: Ningbo Xuyue New Materials Technology Co., LTD.

Construction Site: No. 1-2, Building 1, Wanyang Zhongchuang City, Beilun (Baifeng), Ningbo

Construction content: An annual output of 2000 tons of modified plastic particles

Major environmental measures:

(1) Wastewater treatment measures: The project will implement rain and pollution diversion, and the production wastewater will be discharged after treatment by sewage treatment facilities; Domestic sewage is discharged according to the standard after pretreatment by septic tank.

(2) Waste gas treatment measures: the hot melt extrusion waste gas of this project is collected by the gas collection hood, treated by a set of water spray + activated carbon device (TA003), and discharged through a 25m high exhaust cylinder (DA001) (and Ningbo Yizhu Shimming Health Technology Co., LTD., the extrusion and pouring exhaust gas exhaust gas share the same exhaust cylinder); The mixing machine shall be covered to prevent dust from escaping, and the mechanical ventilation measures of the workshop shall be strengthened. The entrance of the crusher is covered by a soft curtain, and the mechanical ventilation measures of the workshop are strengthened.

(3) Noise prevention measures: The main noise source of this project is the noise generated during the operation of various types of equipment. In order to ensure the standard discharge of factory boundary noise, the plant is rationally arranged and low noise equipment is selected to control the noise.

(4) Solid waste treatment measures: Scraps and unqualified products generated by this project are not solid waste after collection and crushing for reuse; The spray waste liquid and waste activated carbon were collected and entrusted to Ningbo Chitong Grease Co., LTD. Beilun branch for disposal; After collection and temporary storage for shelter, the household garbage shall be entrusted to the sanitation department for regular transportation.

Publicity period: March 8, 2024 - April 7, 2024 (20 working days)

The public can log on to http://www.lejiaxitong.com/ to check the investigation report and acceptance opinions of the project. If the public has comments and suggestions on the construction project, it can be reflected to the construction unit within the publicity period, and please leave contact information (name, address, telephone or email) to reflect the problem in order to get timely feedback.

Name of construction unit: Ningbo Xuyue New Materials Technology Co., LTD.

Contact: Mr. Xing

Tel: 13352370420


Attachment:

Xuyue new material acceptance report.pdf


Ningbo Xuyue New Materials Technology Co., LTD.

March 8, 2024

Responsive image
首頁  |  關(guān)于我們  |  產(chǎn)品中心  |  應(yīng)用領(lǐng)域  |  新聞中心  |  人力資源  |  聯(lián)系我們
  • Responsive image
  • Responsive image

    地址

    浙江省寧波前灣新區(qū)庵東鎮(zhèn)西三村場界路208號
  • Responsive image
  • Responsive image

    關(guān)注我們

  • 佳木斯市| 秭归县| 台南市| 玛曲县| 阳山县| 宁陕县| 陵水| 扶风县| 祁东县| 松溪县| 玉田县| 渝中区| 马尔康县| 昂仁县| 南召县| 嘉义县| 周宁县| 阿坝| 驻马店市| 琼中| 浏阳市| 吉木萨尔县| 汉阴县| 大安市| 巴东县| 革吉县| 襄汾县| 清新县| 同仁县| 启东市| 雷波县| 晋州市| 肇州县| 鄢陵县| 遵义市| 济阳县| 东莞市| 丹凤县| 深水埗区| 蛟河市| 富裕县|